Serving Tampa Bay, East Hillsborough, Pasco & Lakeland • Residential & Commercial • (813) 363-6303
Septic Division

Septic Tank Installation

A new system is a site-specific design problem, not a product you pick off a shelf. Soil, water table and lot size decide what can legally be built.

Request Septic Tank Installation

Florida does not allow a septic system to be sized by rule of thumb. The design follows a site evaluation: soil texture and depth to the seasonal water table, the size and use of the structure, setbacks to wells, surface water and property lines, and the space available for both the system and its drain field.

That is why two neighbouring lots can end up with very different systems and very different costs. Getting the site evaluation right at the start is what keeps the permit, the inspection and the budget predictable.

New construction versus replacement

On new construction the system is designed alongside the house, which allows the drain field, tank and utility routes to be laid out together. On a replacement, the new field has to fit around an existing home, driveway, pool and mature landscaping, and the old system has to be properly abandoned. Replacement sites are usually the tighter constraint of the two.

Permits, design and inspection

Installation is permitted work. Depending on the jurisdiction and the site, the design may need to be prepared or signed off by an engineer, and the county health department or building department inspects at defined stages. We handle the submittal and coordinate the inspections so the sequence does not stall the rest of the build.

System types you may be offered

A conventional gravity system is the simplest and cheapest to operate where the soil and water table allow it. Where they do not, designs move to mounded or elevated systems, aerobic treatment units with pumps, or other engineered options. Each adds equipment, power and maintenance obligations. We explain what your site actually requires rather than defaulting to the most complex option.

When to call

  • Building a new home or accessory structure with plumbing
  • An existing system has failed and cannot be repaired
  • Converting a structure that previously had no plumbing
  • Adding bedrooms or fixtures that exceed the existing design capacity
  • A property has no record of any approved system

How the work is handled

  • Site evaluation covering soils, water table and setbacks
  • System design prepared to the requirements of your jurisdiction
  • Permit application submitted and approvals obtained
  • Installation of tank, drain field and all associated components
  • Inspection coordination and proper abandonment of any old system

What affects the cost

We do not quote a number before seeing the property, because the same job on two similar houses can need different work. These are the factors that move the scope:

  • System type required by the site and soil conditions
  • Tank size determined by bedroom and fixture count
  • Depth to the seasonal water table and required fill
  • Distance and difficulty of the drain field installation
  • Permit fees and any required engineering or design work
  • Abandonment and removal of an existing failed system

Frequently asked questions

How long does a septic installation take?

The physical installation is typically a few days once permits are in hand. The permitting and design phase that precedes it is usually the longer part and varies substantially by county and site complexity.

Can I choose where the tank goes?

Within limits. Setback rules for wells, property lines, surface water, pools and foundations constrain placement, and the drain field has to sit on suitable ground. We work with your preferences wherever the code permits it.

What happens to the old system?

It must be properly abandoned, which typically means pumping it out and then filling or removing it according to the requirements of your jurisdiction. Leaving an old tank in place without abandonment is not an option on a permitted replacement.

Do I need a maintenance contract on a new system?

On a conventional gravity system, routine pumping is the main requirement. If the design includes an aerobic treatment unit or a pump, the county generally requires an ongoing maintenance agreement with a registered provider, and we will tell you if yours does.

Related services

Septic Service across Tampa Bay and Lakeland

Across Tampa Bay the deciding factor is usually the seasonal water table rather than the soil, and it is what pushes many otherwise straightforward lots into an engineered design. We work throughout Tampa, Brandon, Riverview, Valrico, Plant City, Lutz, Land O' Lakes, Wesley Chapel, Odessa, Zephyrhills, Lakeland.

What we see most often in this region

  • Small urban lots with tight setback margins
  • Sites requiring engineered systems due to water table depth
  • New construction sequenced alongside the main build schedule
  • Older parcels with no record of an approved system
Call (813) 363-6303 Email